Latest RailRoad News
Showing posts 1 - 5 of 393.
View more »
| Welcome!After
25 years of running RailCommand and a "home made" signal
system running on an 8088, the management has finally realized that the
system is obsolete and needed to be replaced.
Starting in the summer of 2009, systems were studied and after much debate we have chosen the Easy DCC system by CVP Products and the Signal system produced by R-R CirKits. Both are being installed after removing the old system down to the track jumpers. The signal system will be utilized in conjunction with the JMRI Panel Pro. We are currently using a fast clock from Iowa Scaled Engineering. Other sites to visit: |
Home
Subpages (1):
Town Maps