Welcome to the new Sue Line RailRoad website. Due to changes by Google, we had to change. Some pages may still show up oddly.
Looking for the posts? Click on History or simply click here as a shortcut for now.
PLEASE NOTE: The layout is no longer located in Northern Shreveport. Please do not randomly show up at the property as it belongs to a new family and random people showing up might scare the children.
Welcome!
After 25 years of running RailCommand and a "home made" signal system running on an 8088, the management has finally realized that the system is obsolete and needed to be replaced.
Starting in the summer of 2009, systems were studied and after much debate we have chosen the Easy DCC system by CVP Products and the Signal system produced by R-R CirKits. Both are being installed after removing the old system down to the track jumpers. The signal system will be utilized in conjunction with the JMRI Panel Pro. We are currently using a fast clock from Iowa Scaled Engineering.
Other sites to visit:
if you have comments or questions, please send them to:
joe@kamm.us